SEAR GmbH draws on its many years of expertise in the construction of power plants. This enables us to act in a target-oriented manner in the interests of our customers. Together with other small and medium-sized companies and distribution grid operators, we are working on efficient solutions for transfer technologies such as power-to-heat and energy storage. In the future, we see ourselves as a system integrator for the construction of smart grids and combined cycle power plants.
Our services
- Supply and installation of medium-voltage switchgear
- Supply and installation of self-consumption transformers
- Planning, delivery and installation of low-voltage main and sub-distribution boards
- Supply and installation of UPS and battery systems
- Supply and installation of emergency power systems
- Planning and equipping switchgear rooms
- Planning and installation of cable support systems
- Cable routing and cable laying
- Cable connections and commissioning
- Planning, installation and maintenance of site power systems
- Delivery, installation and commissioning of Ex heating circuit and field distributors
Gas landing and distribution station:
Scope of services:
Electrical engineering planning, installation and commissioning of gas landing and distribution stations
- Site power systems
- MV distribution boards, LV distribution boards, autotransformers
- UPS supply
- Battery systems/emergency power supply
- MSR systems
Project types:
New construction, extensions, conversion
System types:
Gas landing and distribution stations/pressure reducing, measuring, distribution and shut-off systems
Customers/end customers:
Gascade Gastransport GmbH
Cable dimensioning:
Experience & Key facts:
- Medium-voltage switchgear Siemens type 8DJH SF6 gas-insulated
- UPS systems Benning type Enertronic Modular with input and output transformers
- Low-voltage main and sub-distribution boards Siemens type Sivacon
- Electrohydraulic rotary and shut-off actuators type Fahlke EHAZ/GEHAZ
- Electric rotary and modulating actuators type Auma
Reference: Project: EST Lubmin 2
- MS switchgear Siemens type 8DJH gas-insulated: (2 rails/11 bays)
- Self-consumption transformers SGB 1600 kVA (2 units)
- Emergency power system: generator 1300 kVA/motor 1102 kW
- Low-voltage distribution boards Siemens type Sivacon 160A to 2500A (11 systems/66 bays)
- Benning UPS systems: 2 systems/18 panels 200kW/400kW
- Battery systems: 3 systems, nominal capacity 748 Ah each
- Ex heating circuit manifold R. steel (38 pieces)
- Ex field distributor R. steel (55 pieces)
- Low-voltage power and control cable (≈ 180000 m)
- Cable routes/cable paths (≈ 5000 m)
- Extended raised floor in switchgear rooms (≈ 600 m²)
Power to heat:
Scope of services:
Electrical engineering planning, installation and commissioning of electric boiler systems
- MV distribution boards, LV distribution boards, autotransformers
- UPS supply
- MSR systems
Project types:
New construction, conversion
System types:
Electric boiler system
Customers/end customers:
Vattenfall
Experience & Key facts:
- Medium-voltage switchgear 10 kV Ormazabal type GAE SF6 gas-insulated
- Self-consumption transformer SGB
- Medium-voltage switchgear 10 kV ABB type Uni Gear ZS1
- UPS systems Benning rectifier, inverter and battery field
- Low-voltage main distribution board Janssen type: Top Draw 100
- Busbars 10 kV Moser Glaser type Duresca (200 m)
- 10 kV Duresca busbar joints (36 pieces)
Site power supply systems:
Scope of services:
Electrotechnical planning, installation, commissioning and maintenance of site power systems
- Site transformer stations
- Main distribution board
- Building site telephone system
- Cable routing and connections
Project types:
New construction, conversion, maintenance
System types:
Power station
Cable dimensioning:
Customers/end customers:
RWE
Experience & Key facts:
- e.g. project: Construction electricity for Neurath power plant
- Construction power transformer stations 1 MVA (4 pieces)
- Building site transformer stations 630k VA (38 units)
- Site power distribution station (1 piece)
- Main distribution board (172 units)
- KVZ 100 DA construction telephone system (38 units)
- Construction lighting system Distribution boards (30 units)